A year or two ago, a cable enquiry was about impedance, CPR class, fibre count or lead time. Increasingly, it’s also about carbon — specifically, how much CO2e went into making the cable before it ever reached site. Electrical contractors on major construction and data centre projects are now asking cable suppliers for embodied carbon data, and it’s usually the first time anyone at the supplier end has been asked the question directly.
This is the first in a short series of technical documents unpacking what embodied carbon actually means for cable, what the difference is between an Environmental Product Declaration (EPD) and a self-declared figure, and where Webro’s own data currently stands.
What embodied carbon actually means
Embodied carbon is the CO2e (carbon dioxide equivalent) released in producing a product, before it’s even installed or switched on — raw material extraction, processing, manufacturing and transport to the point of sale. For a cable, that means the mining and refining of the copper or aluminium conductor, the production of the insulation and sheath compound, and the energy used to draw, extrude and package the finished product.
This is distinct from operational carbon — the emissions a building or installation produces while it’s in use, which is what most carbon reporting has historically focused on. As buildings themselves become more energy-efficient, the proportion of a project’s total carbon footprint that’s locked in before completion — the embodied carbon — becomes a bigger share of the whole, which is exactly why it’s getting more attention now.
We explain the difference between an EPD and a self-declared figure in more detail in EPDs Explained: What They Are, and What ‘Self-Declared’ Carbon Data Actually Means
Why it’s landing on cable specs now
A few things are converging at once:
• The RICS Whole Life Carbon Assessment standard is increasingly referenced directly in UK project specifications, and it requires embodied carbon to be accounted for at a material and product level, not just estimated at a building level.
• Planning and policy pressure — the London Plan’s whole life carbon requirements and wider government policy are pushing carbon filtering earlier into the design process, before a product is even shortlisted on technical grounds.
• Data centre projects specifically are under particular pressure to account for embodied, not just operational, emissions — and cabling is a significant, previously under-scrutinised component of a data centre fit-out.
• Tighter rules on green claims mean a supplier who can’t back up a sustainability claim with real data is a growing liability for the contractor specifying them, which pushes the request down the supply chain to cable suppliers directly.
EPDs, and why most of them don’t actually cover your cable
An Environmental Product Declaration (EPD) is the recognised, independently verified way of reporting a product’s environmental impact, built to a standardised methodology (EN 15804) and checked against a Product Category Rule for that product type. It’s a genuinely rigorous piece of work — and also an expensive and slow one to produce.
Here’s the catch for cable specifically: most of the EPDs that already exist in this space cover the raw compound — a PVC or LSNH sheathing compound, a copper billet — rather than the finished, assembled cable product actually going into the ground or into a containment route. An EPD for the granulate that goes into a sheath doesn’t tell a contractor what a specific 8-core LSNH alarm cable’s embodied carbon figure actually is. That gap is real, and it’s exactly what’s prompting suppliers to look at other ways of answering the question.
The alternative: CIBSE TM65
CIBSE (the Chartered Institution of Building Services Engineers) publishes TM65, a calculation methodology specifically built for this gap — estimating the embodied carbon of building services products using manufacturer-supplied data on materials and construction, producing a consistent kgCO2e figure without requiring a full third-party-verified EPD for every SKU. CIBSE is explicit that TM65 isn’t intended to replace an EPD — it’s a conservative, practical way of getting a usable figure onto a datasheet while the industry catches up.
This is the route Webro has taken. Figures calculated under CIBSE TM65 are marked clearly as self-declared on our datasheets — an honest label for an honest method, not dressed up as something it isn’t. It sits alongside the CPR fire performance classification already on the datasheet, as a separate figure answering a separate question — fire performance and embodied carbon are two different things, and worth keeping distinct.
Where this leaves the specifier
If you’re a contractor being asked for embodied carbon figures by a client or a sustainability consultant, the practical questions worth asking any cable supplier are straightforward: is a figure available at all, what methodology produced it, and is it clearly labelled as self-declared or independently verified? A supplier who can’t answer those three questions plainly is a bigger problem for your project than a cable that simply doesn’t have a figure yet.
Where Webro stands today
Webro is already publishing CIBSE TM65 self-declared embodied carbon figures on a growing number of products — currently concentrated on the LSNH cable ranges where customer demand has been highest, with more being calculated as requests come in. It’s early, and we’re ahead of the UK cable distribution market by currently offering this at a product level — most of the embodied carbon data available in the wider cable market still sits with the compound manufacturers, or with the handful of cable manufacturers who’ve invested in full EPDs for select ranges.
Source: 6 Oct 2026 - Gary Banfield, Technical Lead at Webro Cables & Connectors, with over 25 years of experience in the cable industry.
Share this post: